Chinese New Year 2027 freight planning for Australian importers and China shipping

Christmas Freight and Chinese New Year 2027: What Australian Importers Need to Know

November marks the beginning of one of the most demanding periods of the international freight calendar. Christmas is just over seven weeks away.

Behind it comes the January rush to move cargo before Chinese New Year 2027, followed by factory closures, reduced production and the inevitable post-holiday backlog when China returns to work.

For Australian importers, these are not three separate events. They form one extended freight planning period running from November through to March.

The businesses that manage it best are usually not the ones reacting fastest when something goes wrong. They are the businesses that planned earlier.

This TFG Global guide explains what is coming, why Chinese New Year 2027 freight planning should already be underway, and what Australian importers and exporters can do now to protect inventory, delivery commitments and freight costs.

Chinese New Year 2027 freight planning | At a Glance

  • Christmas freight is now entering its final meaningful delivery window.
  • Chinese New Year 2027 falls on Saturday 6 February 2027.
  • Many Chinese factories will begin slowing production before the official holiday period.
  • Supplier closure dates can be considerably longer than government public holidays.
  • Carriers are already managing capacity through blank sailings.
  • Drewry expects 56 blank sailings from 715 scheduled East-West departures between 2 November and 7 December, an 8% cancellation rate.
  • Schedule reliability remains weak, with only 50.6% of global services on time in September.
  • Asia-to-Australia peak-season surcharges have begun appearing.
  • BMSB requirements remain active for applicable Australian imports until 30 April 2027.
  • January freight planning should begin now, not after Christmas.

Why Does Chinese New Year 2027 Matter for Freight?

Chinese New Year 2027 falls on 6 February 2027.

For freight and supply chains, however, the important date is rarely just 6 February. Factories may begin slowing production weeks earlier as employees travel home. Suppliers may establish their own closure periods. Trucking availability can tighten. Warehouses reduce operations. Export bookings increase as businesses try to get cargo out before production stops.

This means the Chinese New Year 2027 freight rush is likely to become increasingly important through January. Importers that wait until the middle of January to start discussing production and freight may find that the commercial decision has already been made for them.

The factory may not finish production in time. The preferred sailing may be full. The container may miss cut-off.

Or the order may simply sit until factories return after Chinese New Year.

The Freight Calendar From November to March

The easiest way to understand the next few months is as one continuous supply-chain cycle.

November: The Christmas Freight Window

November is the point where Australian importers need to separate stock that would be nice to receive before Christmas from stock that must arrive before Christmas. There is a big difference.

Cargo that still needs to travel internationally, clear Australian customs and biosecurity, be unpacked and delivered into a warehouse is now working against a shrinking calendar.

And shipping reliability remains far from normal.

Sea-Intelligence recorded global liner schedule reliability of 50.6% in September 2026.

Late vessels were arriving an average of 6.65 days behind schedule.

For importers, that means the published ETA should not automatically be treated as the warehouse delivery date.

A container can arrive at port and still require:

  • customs clearance;
  • biosecurity processing;
  • terminal availability;
  • container collection;
  • unpacking; and
  • final delivery.

The correct question is therefore not:

When does the vessel arrive? It’s When does the stock need to be available to the business?

December: The Delivery Bottleneck

December introduces a different problem. Even where cargo arrives in Australia, the domestic logistics network becomes increasingly busy:

  • Warehouses have receiving cut-offs;
  • Transport providers have reduced working days;
  • Customers close;
  • Staff take leave; and/or,
  • Container unpack operations become compressed into fewer working days.

This can create situations where cargo technically arrives before Christmas but cannot practically be delivered until January. Australian importers should therefore establish Christmas and New Year closure dates across their entire supply chain, including:

  • their own warehouse;
  • third-party logistics providers;
  • customers;
  • transport companies; and
  • unpack depots.

The shipment is not complete when the vessel arrives. It is complete when the cargo reaches the location where it is actually needed.

January: The Chinese New Year Freight Rush

Once Australia returns from the Christmas and New Year break, attention moves almost immediately to China. Chinese New Year is early in 2027, falling on 6 February. That leaves a relatively short January freight window.

Importers need to confirm:

  • When will production finish?
  • When will the factory close?
  • When is the last day containers can be loaded?
  • When will trucking stop?
  • Which vessel does the cargo need to make?
  • What happens if that vessel is missed?

These conversations should happen before Christmas wherever possible. January should be about executing the plan rather than discovering that one is needed.

February: China Slows Down

The popular description is that “China closes for Chinese New Year”. The reality is more complicated; there is an official holiday period, but individual factory shutdowns vary significantly. Some factories may remain operational longer, whilst others may close earlier. Some employees return quickly, whilst others may not return for several weeks.

Production capacity can therefore remain below normal even after the official holiday period has ended.

That is why TFG Global recommends obtaining supplier-specific closure and reopening dates, rather than relying solely on public holiday calendars.

Chinese New Year freight planning should be based on what the actual factory intends to do.

February and March: The Restart Problem

The reopening of factories does not immediately return the freight market to normal. When manufacturing restarts, businesses begin releasing orders that were:

  • unfinished before Chinese New Year;
  • held during the shutdown;
  • placed during the holiday;
  • or waiting for suppliers to return.

That cargo enters the freight network at roughly the same time.

The result can include:

  • factory production backlogs;
  • equipment shortages;
  • container demand;
  • trucking pressure;
  • vessel space constraints;
  • blank sailings;
  • cargo rollovers; and
  • changed freight rates.

The post-Chinese New Year period can therefore be almost as important as the shutdown itself.

Blank Sailings Add Another Layer of Risk

One issue Australian importers should watch closely through the coming months is blank sailings. A blank sailing occurs when a shipping line cancels a scheduled voyage or removes a particular port call. Carriers use them for several reasons, including managing vessel utilisation and matching capacity with available cargo.

Drewry currently expects 56 blank sailings across 715 planned East-West departures between 2 November and 7 December 2026., representing around 8% of scheduled sailings.

The impact goes beyond one cancelled voyage. Cargo originally booked on that sailing needs to move somewhere else, creating additional demand for the next available vessels.

Containers may roll. Space becomes tighter. Schedules change. The knock-on effect can continue for several weeks.

This becomes particularly important around Chinese New Year because carriers regularly adjust capacity around changing factory output and cargo demand.

Peak-Season Surcharges Are Already Appearing

Freight prices also need to be watched carefully.

Maersk introduced a new Asia-to-Oceania Peak Season Surcharge effective from 1 November 2026.

For applicable cargo moving from a wide range of Asian origins into Australia, the published surcharge is:

  • US$500 per 20-foot dry container; and
  • US$1,000 per 40-foot or 45-foot dry container.

This demonstrates why businesses should not rely only on headline global freight indices. A global benchmark may show ocean freight rates falling while the actual cost for an Australian importer increases because of trade-specific surcharges. The meaningful number is the total shipment cost, not simply the advertised ocean rate.

Why Booking Early Matters

Early booking does not guarantee that nothing will go wrong. It does, however, give businesses more options.

If a preferred vessel is full, there may be another departure. If one carrier introduces a surcharge, another service can be reviewed.

If production slips, there may still be enough time to change the sailing. If an urgent portion of an order needs to move by air, that decision can be made before it becomes an emergency.

Late planning removes those options. The most expensive freight decisions are often made when there is no longer enough time to choose.

BMSB Is Still Part of the Planning Equation

Australian importers also need to remember that the 2026-27 Brown Marmorated Stink Bug season continues through this entire peak period.

DAFF’s seasonal measures apply to applicable targeted goods manufactured in or shipped from target risk countries between 1 September and 30 April inclusive.

This means BMSB remains relevant throughout:

  • Christmas;
  • Chinese New Year;
  • the February restart;
  • and the March freight recovery.

Where treatment is required, it needs to be planned into the shipment before cargo moves. A container already facing a tight delivery window does not need an avoidable biosecurity problem added on arrival.

What Australian Importers Should Do Now

The first step is to stop thinking only about the next shipment. Look at the entire order book through to at least March or April 2027.

Identify cargo that:

  • must arrive before Christmas;
  • must ship before Chinese New Year;
  • is required for January or February production;
  • supports customer commitments;
  • contains seasonal or promotional stock;
  • or would be expensive to replace with airfreight.

Then work backwards. TFG Global recommends businesses confirm supplier production schedules and closure dates now, including the last practical production date before Chinese New Year. Freight bookings should be discussed early, particularly for critical inventory. Documentation should be prepared before cargo becomes urgent. And Australian warehouse availability should form part of the freight plan, not an afterthought.

Build Buffer Into the Plan

A strong supply chain plan includes contingency. If a shipment normally takes five weeks from factory to warehouse, planning around exactly five weeks leaves no room for:

  • port congestion;
  • blank sailings;
  • rollovers;
  • weather;
  • transhipment delays;
  • biosecurity;
  • customs queries;
  • or domestic delivery problems.

The appropriate buffer depends on the shipment. But zero buffer is not a strategy.

Consider Splitting Critical Orders

Not every product in a purchase order has the same commercial importance. Where inventory is critical, businesses may consider splitting shipments.

For example:

  • the majority travels by ocean freight;
  • a smaller urgent quantity moves by airfreight;
  • and the balance follows once Chinese production normalises.

That can sometimes protect production or customer commitments without paying airfreight rates on the entire order. The important part is identifying the problem early enough to have that choice.

A Quick Peak-Season Freight Guide

Freight forwarder
The logistics provider coordinating the movement between supplier, carrier, customs, delivery and other parties.

Carrier
The shipping line or airline physically carrying the freight.

Cut-off
The deadline by which cargo, documentation or containers must be ready for a particular sailing.

Blank sailing
A scheduled voyage or port call that the carrier cancels.

Rollover
Cargo booked on one vessel that does not load and is transferred to a later sailing.

ETD
Estimated time or date of departure.

ETA
Estimated time or date of arrival.

Peak Season Surcharge
An additional carrier charge introduced during periods of increased demand or constrained capacity.

FCL
Full Container Load.

LCL
Less than Container Load, where multiple shipments share container space.

How TFG Global Approaches Peak-Season Freight

Peak-season freight should not begin with finding the cheapest sailing; instead, it should begin with the required delivery date. TFG Global works backwards from that requirement to review:

  • cargo readiness;
  • supplier location;
  • available sailings;
  • transit time;
  • transhipment risk;
  • container availability;
  • carrier pricing;
  • surcharges;
  • customs and biosecurity requirements; and,
  • final Australian delivery.

The objective is not simply to make a booking; it is to build a freight plan that gives the shipment a realistic chance of arriving when the business needs it.

TFG Global Recommendation

Businesses with China, Asia or international freight moving between now and March should start planning the entire period immediately:

  • For Christmas freight, confirm what can realistically still arrive before holiday closures.
  • For January cargo, confirm Chinese factory schedules before Australia shuts down for Christmas.
  • For Chinese New Year 2027 freight, establish the last practical production and sailing dates now.
  • And for February and March inventory, allow for a gradual rather than immediate return to normal manufacturing and freight conditions.

The businesses that manage this period best are rarely the ones reacting to every problem. They are the ones that created options before the problem appeared.

Summary

Christmas freight and Chinese New Year 2027 create an extended peak-season planning period for Australian importers. Christmas compresses the remaining 2026 delivery calendar:

  • January brings the pre-Chinese New Year production and freight rush.
  • Chinese New Year falls on 6 February 2027.
  • Factory closures and reduced production can extend beyond the official holiday period.
  • And the post-holiday restart can create another round of congestion and vessel demand.

Add blank sailings, peak-season surcharges, weak schedule reliability and BMSB requirements, and the message is clear: November is the time to plan the next several months, not simply the next shipment.

Conclusion

Peak season does not have to mean supply-chain chaos. Most of the major pressure points between November and March are predictable:

  • Christmas comes every year.
  • Chinese New Year comes every year.
  • Factories close.
  • Carriers adjust capacity.
  • Freight volumes rise.

The uncertainty comes from exactly how those factors affect an individual shipment.

That is why early planning matters:

  • Know when the cargo needs to arrive.
  • Know when the factory will close.
  • Know which sailing it needs to make.
  • Know what the alternative is if it does not.

TFG Global will continue monitoring freight conditions, carrier capacity and China-related supply-chain developments as businesses move through Christmas and into the Chinese New Year 2027 freight cycle.

—

When it comes to freight forwarding, we are the full package. Market-leading service, values, and solutions.

For all your freight-forwarding solutions, internationally and Australia-wide, you need TFG Global.

Phone: 1300 (693 734) MY FREIGHT | +61 3 9090 7546
Email: andrew@tfgglobal.com.au
Web: www.tfgglobal.com.au

Disclaimer

TFG Global makes reasonable efforts to ensure the information contained in this publication is accurate and current at the time of writing. However, freight markets, carrier operations, regulatory requirements, and supply chain conditions are subject to change and may vary by shipment, trade lane, carrier, port, or service.

This publication may include information sourced from third parties, industry reports, carrier updates, and publicly available data. While TFG Global considers these sources to be reliable, it does not warrant the accuracy, completeness, or timeliness of such information, nor does it endorse any third-party views or opinions.

The information provided is general in nature and does not constitute legal, financial, customs, or logistics advice. Nothing in this publication is intended to exclude, restrict, or modify any rights or remedies available under Australian Consumer Law.

To the extent permitted by law, TFG Global disclaims liability for any loss, damage, cost, or expense arising from reliance on this information, whether direct or indirect. Readers should seek advice specific to their circumstances before making freight or supply chain decisions.

FAQ | Chinese New Year 2027 freight planning

When is Chinese New Year 2027?

Chinese New Year falls on Saturday 6 February 2027. Individual factory closure and reopening dates can vary substantially from the public holiday period.

When should I book freight before Chinese New Year 2027?

Critical shipments should be planned well before January. Importers should confirm factory schedules and freight requirements before Christmas wherever possible.

How long do Chinese factories close for Chinese New Year?

There is no single factory shutdown period. Individual businesses may close before the official holiday and can take different amounts of time to return to normal production afterwards.

Why do freight rates increase before Chinese New Year?

Factories and exporters attempt to move large volumes of cargo before shutting down, increasing demand for available vessel and airfreight capacity. Carriers can also adjust capacity and introduce surcharges.

What is a blank sailing?

A blank sailing occurs when a carrier cancels a scheduled vessel departure or port call. Cargo may then need to move on a later sailing.

Can freight still be delayed after Chinese New Year?

Yes. Factory backlogs, increased cargo volumes, equipment demand and carrier capacity adjustments can continue affecting freight during February and March.

Is BMSB still active during Chinese New Year?

Yes. Australia’s 2026-27 BMSB seasonal measures continue until 30 April 2027 for applicable goods and trade pathways.